Laserfiche WebLink
Geo-Loqk <br />ASS0CIATES <br />CQA DAILY SUMMARY REPORT #010 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />direction on how to proceed above that line due to a deep along the WMU-8 existing slope. The Contractor <br />would continue WMU FU13 floor excavation. The Contractor stated that approximately 48,000 CY. were <br />placed in the buttress area. The Contractor would continue clearing and grubbing on proposed clay borrow <br />located approximately 400 ft east of the Unit. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking west on east side of proposed clay borrow for FU13. <br />PACE 2 OF 2 <br />• <br />• <br />