My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo-LoqkASS0CIATES <br />CQA DAILY SUMMARY REPORT #010 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: <br />Manteca, CA Owner: <br />Republic Services <br />CQA Consultant: <br />Geologic Associates Contractors: <br />Guinn Construction <br />Prepared by: <br />Jose Armenta (GLA) <br />Comanco Environmental Corp. <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Report No.: 010 <br />Report Date: Thursday May 30, 2013 <br />Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 56 <br />OF Clear <br />PM: 88°F Clear <br />Guinn Construction Activities: <br />• Guinn construction continued clearing work on proposed clay borrow area located approximately 400 ft east <br />of WMU FU13. The unsuitable soil material was transferred and stockpiled along the south side of the <br />proposed clay borrow. <br />• The Contractor completed buttress fill placement to the 68 contour line using material from cut floor area. <br />.The Contractor performed continuous moisture conditioning and sheepsfoot compaction work. <br />• The Contractor continued rough grading of 2:1 slope area with D6 Cat dozer. <br />• The Contractor performed continuous moisture conditioning of haul roads and adjacent areas for dust <br />control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (7) Operators, (2) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring and lab and field moisture -density testing of the buttress fill <br />placement. ' <br />• CQA personnel continued monitoring excavation work in the Cell floor. <br />• CQA personnel continued monitoring the clearing work being performed on proposed clay borrow. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would complete buttress fill to the 68 contour line today and wait for the design engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.