My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkASS0CIATES <br />CQA DAILY SUMMARY REPORT #013 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 013 Report Date: Tuesday June 04, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 61 OF Clear PM: 90°F Clear <br />Guinn Construction Activities: <br />• The Contractor continued FU13 floor excavation, continued excavation of LCRS trenches on subgrade; the <br />excavated material was transferred to stockpile located south of the Unit. <br />• The Contractor removed unsuitable sandy subgrade soil material from NE corner of floor, approximately 200 <br />cy. The unsuitable soil was transferred to the soil stockpile located south of the Unit. The Contractor <br />.performed soil moisture conditioning, placement, and compaction in the area mentioned above. <br />• The Contractor continued grading work on the west and north slopes with a motor grader and a D6 Cat <br />dozer. <br />• The Contractor performed clearing work along the synthetic liner tie-in at top of the North Slope. <br />• The Contractor performed continuous moisture conditioning of haul roads and adjacent areas for dust <br />control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (3) Operators, (2) Laborers. <br />E ui mgnt: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (2) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />• <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel monitored removal of unsuitable subgrade soil in NE corner of the Cell floor. <br />• CQA personnel monitored placement and compaction work of suitable soil material in the NE corner of the <br />Cell; CQA performed field moisture -density testing on compacted fill. <br />Meetings and Site Discussions: <br />
The URL can be used to link to this page
Your browser does not support the video tag.