Laserfiche WebLink
Geo -Lo <br />iC <br />AS SO C l ATE SV <br />CQA DAILY SUMMARY REPORT #01 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue slope finishing work. The Contractor would continue excavation of the LCRS <br />trenches on subgrade. The Contractor would perform clearing work along the North tie-in with excavator and <br />two (2) laborers. <br />• The Contractor would remove unsuitable subgrade material from NE corner of Cell floor as requested by CQA <br />personnel. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking NW on NE corner of FU 13, unsuitable subgrade soil removal. <br />PAGE 2 OF 3 <br />is <br />