My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo-Lo!lk <br />ASS0CIATES <br />CQA DAILY SUMMARY REPORT #022 <br />REPUBLIC SERVICES FORWARD LANDFILLf FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 022 Report Date: Monday June 17, 2013 Onsite: 07:00 - 17:30 Hrs <br />Weather: AM: 56 OF Clear PM: 87°F Clear <br />Guinn Construction Activities: <br />• The Contractor continued work in the clay borrow and stockpile areas; performed ripping, moisture <br />conditioning, and excavation. <br />• The Contractor continued transferring clay material to the clay stockpile located along the south limits of FLl- <br />13. The Contractor performed continuous moisture conditioning with disc and two water trucks. <br />• The Contractor completed excavation of the side slope liner anchor trench along the east liner limits using a <br />ditch witch tractor. <br />The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift, (1) Ditch Witch Tractor. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel monitored clay processing operation at all times insuring suitability of soil material and proper <br />moisture conditioning. <br />• CQA personnel performed visual and lab soil classification testing of clay soil material being stockpiled. <br />• CQA personnel verified side slope liner anchor trench dimensions. <br />• Meetings and Site Discussions: <br />PAGE 1 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.