Laserfiche WebLink
• <br />Geo-Lo!lk <br />ASS0CIATES <br />CQA DAILY SUMMARY REPORT #022 <br />REPUBLIC SERVICES FORWARD LANDFILLf FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 022 Report Date: Monday June 17, 2013 Onsite: 07:00 - 17:30 Hrs <br />Weather: AM: 56 OF Clear PM: 87°F Clear <br />Guinn Construction Activities: <br />• The Contractor continued work in the clay borrow and stockpile areas; performed ripping, moisture <br />conditioning, and excavation. <br />• The Contractor continued transferring clay material to the clay stockpile located along the south limits of FLl- <br />13. The Contractor performed continuous moisture conditioning with disc and two water trucks. <br />• The Contractor completed excavation of the side slope liner anchor trench along the east liner limits using a <br />ditch witch tractor. <br />The Contractor continued moisture conditioning of haul roads and adjacent areas for dust control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift, (1) Ditch Witch Tractor. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />• CQA personnel monitored clay processing operation at all times insuring suitability of soil material and proper <br />moisture conditioning. <br />• CQA personnel performed visual and lab soil classification testing of clay soil material being stockpiled. <br />• CQA personnel verified side slope liner anchor trench dimensions. <br />• Meetings and Site Discussions: <br />PAGE 1 OF 3 <br />