Laserfiche WebLink
Geo-Losic <br />A S S o C l AT E S <br />CQA DAILY SUMMARY REPORT #022 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue efforts on processing and stockpiling of clay soil material; would complete <br />excavation of side slope liner anchor trench. <br />Site Visitors: <br />None <br />Photos: <br />Fig.1 Looking NW on east half FU 13, liner termination anchor trench excavation. <br />fid <br />• <br />• <br />