• <br />Geo -Lo <br />iC <br />AS SOCIATE Sg <br />CQA DAILY SUMMARY REPORT #031 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 031 Report Date: Friday June 28, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 62°F Clear PM: 84°F P. Cloudy <br />Guinn Construction Activities: <br />The Contractor completed clay placement across the Cell floor. <br />• The Contractor performed moisture conditioning of clay material in the clay borrow using a tractor with disc <br />and two water trucks. <br />• The Contractor performed continuous moisture conditioning and sheepsfoot compaction during clay <br />• placement. The Contractor continued using a D6 Cat dozer and a motor grader equipped with GPS for lift <br />thickness control. <br />• The Contractor performed continuous moisture conditioning of haul roads and adjacent areas for dust <br />control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators, (3) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />Comanco Lining Activities: 0500-1630 hrs <br />• Comanco mobilized to the site on Friday. Comanco started preparing sandbags to ballast the synthetic liner <br />during installation. There was no additional activity today. <br />• Equipment: (1) Fork Lift, (1) equipment trailer, (1) Van, (3) Trucks Personnel: 12 <br />CQA (GLA) Activities: Field Personnel (2) <br />. CQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />