Laserfiche WebLink
Geo -Logic <br />A S S 0 C I A T E S <br />CQA DAILY SUMMARY REPORT #031 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel continuously monitored the placement of clay material insuring proper lift thickness, <br />uniformity of moisture, and compaction during placement. CQA personnel performed field moisture -density <br />testing of the compacted clay material in accordance with the project specifications. The Contractor would <br />keep moisture conditioning the clay surface and the clay stockpile over the weekend 06/29 through 06/30 <br />during day light hrs. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would complete placement of the clay liner across the entire Cell floor. <br />• Met with Jose (Comanco Superintendent) in the morning to discuss planned activity for the work shift. <br />Comanco would start preparing sand bags for use during installation of the synthetic liner. Comanco would <br />continue work on Monday 07/01. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking NE on FU13. <br />• <br />• <br />