Laserfiche WebLink
Geo-LoqkA S S O C I Ai E S <br />CQA DAILY SUMMARY REPORT #03 <br />.....__._.__._. <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel monitored moisture conditioning and grading work being performed on the clay surface. <br />• CQA personnel performed a preliminary walk over slope surface area intended for synthetic liner installation <br />with Guinn and Comanco personnel. CQA personnel marked small rough areas on subgrade with marking <br />paint for repair. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Superintendent) in the morning to discuss planned activity for the work shift. <br />The Contractor would continue placement of clay across the entire Cell floor. <br />• Met with Jose (Comanco Superintendent) in the morning to discuss planned activity for the work shift. <br />Comanco would continue preparing sand bags for use during installation of the synthetic liner; would stage <br />liner rolls on the slope and conduct a walk with CQA over slope areas intended for liner installation. <br />Site Visitors: <br />None <br />Photos: <br />Fig.1 Looking SE on FU 13. <br />• <br />• <br />