Laserfiche WebLink
• <br />Geo-Losic <br />A S S O C I A T E S <br />CQA DAILY SUMMARY REPORT #032 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 032 Report Date: Monday July 1, 2013 Onsite: 07:00 - 17:30 Hrs <br />Weather: AM: 71°F Clear PM: 102°F P. Cloudy <br />Guinn Construction Activities: <br />• The Contractor performed rough grading on clay liner along the toe of the west and north slopes. <br />• The Contractor performed continuous moisture conditioning of the clay surface across the Cell floor. <br />• The Contractor performed continuous moisture conditioning of the access roads and adjacent areas for dust <br />control. <br />• • The Contractor performed subgrade repair work on small areas along the tie-in and 3:1 slope as pointed out <br />by CQA personnel. <br />• The Contractor performed moisture conditioning and work with the smooth drum roller on the 3:1 slope <br />intended for liner installation. <br />Personnel: (1) Superintendent, (1) Grade Checker, (6) Operators, (3) Laborers. <br />Equipment: (1) 825 Cat Sheepsfoot compactor, (1) 140H Cat Motor -Grader, (3) Water trucks, (1) Cat Excavator, <br />(3) D6 Cat Dozers, (5) 637 Cat Scrapers, (1) Cat Fork-lift. <br />Comanco Lining Activities: 0500-1630 hrs <br />• Comanco continued preparing sand bags for use during installation of the synthetic liner. <br />• The Contractor staged GCL and HDPE liner rolls at top of the North Slope for installation on the 3:1 slope. <br />• Equipment: (2) Fork Lifts, (1) equipment trailer, (1) Van, (3) Trucks Personnel: 12 <br />CQA (GLA) Activities: Field Personnel (2) <br />iCQA personnel performed continuous monitoring of all construction activities insuring conformance with the <br />project specifications. <br />PAGE 1 OF 3 <br />