• <br />Geo-Lo!lkASS0CIATES <br />CQA DAILY SUMMARY REPORT #03S <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 035 Report Date: Thursday July 4, 2013 <br />Weather: AM: 70°F Clear <br />Guinn Construction Activities: Personnel: (1) Operator <br />Onsite: 05:00 - 16:30 Hrs <br />PM: 103°F Clear <br />• Guinn Construction crew is off today in observance of the 4th of July Holiday, except for a water truck <br />operator. <br />The Contractor performed moisture conditioning of exposed clay surface at approximately two (2) hr <br />intervals. <br />0 Equipment: (1) Water truck. <br />Comanco Lining Activities: 0500-1630 hrs <br />• Comanco continued installation of the GCL and the single sided HDPE liners on the lower 2:1 slope starting <br />at the WMU FU8 tie-in line. The Contractor installed the GCL and the HDPE panels starting at the toe of the <br />slope onto the bench. The GCL panels were overlapped a minimum of 12 -inches along the length of the <br />panels and seven (7) feet on the bench with no cross seams on the slope, granular bentonite was applied on <br />all GCL seams. The Contractor covered and secured all GCL installed today with HDPE liner and ballast <br />sandbags. <br />• The Contractor installed the HDPE liner over approved GCL layer upon completion of a walkthrough <br />inspection with the Contractor's CQC and GLA CQA personnel. The Contractor performed pre -weld tests on <br />machine welder -technician combinations prior to the welding of the HDPE liner seams. The Contractors <br />construction quality control (CQC) personnel marked all panels with roll and panel numbers during <br />deployment. All DDPE liner material installed was secured with ballast sand bags at the end of the work <br />shift. <br />• Stopped synthetic liner installation work at 1600 hrs due to high ambient temperature of 106 ,1cl.F <br />•0 Equipment: (1) Fork Lift, (1) equipment trailer, (1) Van, (3) Trucks Personnel: 12 <br />