My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo -Logic <br />ASSOCIATES <br />CQA DAILY SUMMARY REPORT #035 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel continued monitoring the moisture conditioning of the exposed clay surface throughout the <br />work -shift. <br />• CQA personnel monitored the installation of the GCL at all times insuring proper handling and orientation of <br />the GCL panels on the slope; performed visual inspection of GCL liner surface prior to the installation of the <br />HDPE liner insuring conformance with the project specifications. <br />• CQA personnel monitored installation of the HDPE liner at all times insuring that proper procedures were <br />used to prevent damage to the underlying synthetic liner. CQA monitored and inspected all panel seams for <br />cleanliness, minimum overlap, and the implementation of proper seaming procedures. <br />Meetings and Site Discussions: <br />• Met Jose (Comanco Superintendent) in the morning to discuss planned activity for the work shift. The <br />Contractor would start installation of the GCL and the HDPE on the lower 2:1 slope. The Contractor would <br />plan installation considering expected high temperatures in the afternoon. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking west on east side of proposed clay borrow for FU 13. <br />F;�IeI;�ZiII;�►a <br />
The URL can be used to link to this page
Your browser does not support the video tag.