Laserfiche WebLink
Geo-LoqkASS0CIATES <br />CQA DAILY SUMMARY REPORT #036 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel continued monitoring the moisture conditioning of the exposed clay surface throughout the <br />work -shift. <br />• CQA personnel monitored the installation of the GCL at all times insuring proper handling and orientation of <br />the GCL panels on the slope; performed visual inspection of GCL liner surface prior to the installation of the <br />HDPE liner insuring conformance with the project specifications. <br />• CQA personnel monitored installation of the HDPE liner at all times insuring that proper procedures were <br />used to prevent damage to the underlying synthetic liner. CQA monitored and inspected all panel seams for <br />cleanliness, minimum overlap, and the implementation of proper seaming procedures. <br />• CQA personnel marked seam destructive samples of HDPE production seaming to -date. <br />• CQA personnel monitored and documented non-destructive air pressure and vacuum testing of HDPE hot <br />wedge fusion and extrusion welds. <br />Meetings and Site Discussions: is <br />• Met Jose (Comanco Superintendent) in the morning to discuss planned activity for the work shift. The <br />Contractor would continue installation of the GCL and the HDPE on the lower 2:1 slope. The Contractor <br />would plan the installation of the GCL and the HDPE considering expected high temperatures in the <br />afternoon. <br />Site Visitors: <br />• None <br />Photos: <br />0 <br />