My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkASSOCIATES <br />CQA DAILY SUMMARY REPORT #036 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 036 Report Date: Friday July 5, 2013 Onsite: 05:00 - 16:30 Hrs <br />Weather: AM: 73°F Clear PM: 99°F Clear <br />Guinn Construction Activities: 0700-1730 hrs <br />• Guinn Construction crew will be off until 07/08 in observance of the 4th of July Holiday, except for a water <br />truck operator. <br />• The Contractor performed moisture conditioning of exposed clay surface at approximately two (2) hr <br />intervals. <br />• Personnel: (1) Operator <br />Equipment: (1) Water truck. <br />Comanco Lining Activities: 0500-1530 hrs <br />• Comanco continued installation of the GCL and the single sided HDPE liners on the lower 2:1 slope. The <br />Contractor installed the GCL and the HDPE panels starting at the toe of the slope onto the bench. The GCL <br />panels were overlapped a minimum of 12 -inches along the length of the panels and seven (7) feet on the <br />bench with no cross seams on the slope, granular bentonite was applied on all GCL seams. The Contractor <br />covered and secured all GCL installed today with HDPE liner and ballast sandbags. <br />• The Contractor installed the HDPE liner over approved GCL layer upon completion of a walkthrough <br />inspection with the Contractor's CQC and GLA CQA personnel. The Contractor performed pre -weld tests on <br />machine welder -technician combinations prior to the welding of the HDPE liner seams. The Contractors <br />construction quality control (CQC) personnel marked all panels with roll and panel numbers during <br />deployment. All DDPE liner material installed was secured with ballast sand bags at the end of the work <br />shift. <br />• Personnel: 12 <br />• • Equipment: (1) Fork Lift, (1) equipment trailer, (1) Van, (3) Trucks <br />CQA (GLA) Activities: Field Personnel (2) <br />9-1110169 <br />•Tim <br />
The URL can be used to link to this page
Your browser does not support the video tag.