Laserfiche WebLink
Geo -Logic <br />A S S O C I AT E S <br />CQA DAILY SUMMARY REPORT # <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Comanco performed HDPE liner repairs. The liner repairs consisted of patches on "T" seams, welding <br />equipment burn outs, air- pressure testing holes, and seam destructive testing locations. <br />• Personnel: 12 <br />• Equipment: (2) Fork Lifts, (1) equipment trailer, (1) Van, (3) Trucks <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel continued monitoring the moisture conditioning of the exposed clay surface throughout the <br />work -shift. <br />• CQA personnel monitored installation of the HDPE liner at all times insuring that proper procedures were <br />used to prevent damage to the underlying clay liner. CQA monitored and inspected all panel seams for <br />cleanliness, minimum overlap, and the implementation of proper seaming procedures. <br />• CQA personnel marked seam destructive samples of HDPE production seaming to -date. <br />• CQA personnel monitored and documented non-destructive air pressure and vacuum testing of HDPE hot* <br />wedge fusion and extrusion welds. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Construction Superintendent) and Jose Hernandez (Comanco Superintendent) <br />in the morning to discuss planned activity for the work shift. Comanco would start installation of the HDPE <br />on the north section of the Cell floor. <br />Guinn Construction would complete moisture conditioning of clay surface in the morning; would start <br />transferring drainage gravel material to the site. <br />Site Visitors: <br />• None <br />Photos: <br />• <br />PAGE 2OF3 <br />