Laserfiche WebLink
Geo-LoqkASSOCIATE <br />CQA DAILY SUMMARY REPORT #042 <br />0 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 042 Report Date: Friday July 12, 2013 <br />Weather: AM: 62°F Clear <br />Guinn Construction Activities: <br />Onsite: 05:00 - 16:30 Hrs <br />PM: 92°F Clear <br />• The Contractor continued transferring drainage gravel material to the site; the drainage gravel material was <br />stockpiled along the NE side outside of FU -13. <br />• The Contractor continued moisture conditioning of access roads and adjacent areas. <br />0 Personnel: (1) Superintendent, (1) Grade Checker, (2) Operators. <br />Equipment: (1) 140H Cat Motor -Grader, (1) Water truck, (1) Cat Excavator, (2) D6 Cat Dozers, (2) 637 Cat <br />Scrapers, (1) Cat Fork-lift, (1) 623 Cat Scraper. <br />Comanco Lining Activities: 0500-1530 hrs <br />• The Contractor concentrated efforts on the testing and repair work over the double sided textured HDPE <br />liner on the Cell floor. The Contractor performed pre -weld tests on machine welder -technician combinations <br />prior to the welding of the HDPE liner seams. <br />• Comanco performed non-destructive air -pressure and vacuum testing of HDPE liner seams. <br />• Comanco performed HDPE liner repairs. The liner repairs consisted of HDPE patches on "T" seams, welding <br />equipment burn outs, air- pressure testing holes, and seam destructive testing locations. <br />• Personnel: 12 <br />Equipment: (2) Fork Lifts, (1) equipment trailer, (1) Van, (3) Trucks <br />. CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />PAGE 1 OF 2 <br />