Laserfiche WebLink
Geo-LogiC <br />ASSOCIATE <br />CQA DAILY SUMMARY REPORT # <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel monitored installation of the HDPE liner at all times insuring that proper procedures were <br />used to prevent damage to the underlying clay liner. CQA monitored and inspected all repair seams for <br />cleanliness, minimum overlap, and the implementation of proper seaming procedures. <br />• CQA personnel monitored and documented non-destructive air pressure and vacuum testing of HDPE hot <br />wedge fusion and extrusion welds. <br />Meetings and Site Discussions: <br />• Met with Kevin Turner (Guinn Construction Superintendent) and Jose Hernandez (Comanco Superintendent) <br />in the morning to discuss planned activity for the work shift. Comanco would complete all repairs of the <br />HDPE on the Cell floor. <br />Guinn Construction would have limited activity today. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking west on southeast side of FU13 floor. <br />PAGE 2 OF 2 <br />• <br />