My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Losic <br />ASSOCIATE <br />CQA DAILY SUMMARY REPORT # <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Personnel: 13 <br />• Equipment: (2) Fork Lifts, (1) equipment trailer, (1) Van, (3) Trucks <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel monitored installation of the geogrid and the HDPE liner at all times insuring that proper <br />procedures were used to prevent damage to the underlying materials. CQA monitored and inspected all <br />HDPE panel seams for cleanliness, minimum overlap, and the implementation of proper seaming procedures. <br />• CQA personnel monitored the installation of the 12 -oz geotextile at all times ensuring proper seaming <br />methods and handling to prevent damage to the underlying synthetic liner. <br />• CQA personnel performed a final walkthrough inspection with the liner CQC personnel over the HDPE liner <br />surface upon completing cleaning work prior to the geotextile installation on the Cell floor. <br />Meetings and Site Discussions: <br />• Met Kevin (Guinn Superintendent) and Jose Hernandez (Comanco Superintendent) in the morning to discuss <br />planned activity for the work shift. Guinn construction will prepare the perforated 6 -inch HDPE pipe along the <br />south LCRS trench. <br />• Comanco would continue installation of the HDPE on the top deck; will continue cushion geotextile <br />installation on the Cell floor. <br />Site Visitors: <br />• None <br />Photos: <br />PAGE 2OF3 <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.