My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkASS0CIATES <br />• CQA DAILY SUMMARY REPORT #049 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 049 Report Date: Saturday July 20, 2013 Onsite: 05:00 - 16:30 Hrs <br />Weather: AM: 66°F Clear PM: 96°F Clear <br />Guinn Construction Activities: <br />• Guinn Construction continued welding perforated 6 -inch HDPE pipe along the south side of the Cell floor. <br />• The Contractor performed moisture conditioning during work on all access roads and adjacent areas to the <br />Cell. <br />• The Contractor completed cleaning work along the west tie-in line below the 4:1 slope in order to replace <br />• existing damaged Geocomposite. <br />Personnel: (3) Operators, (2) Laborers, (1) Grade Checker, (1) Supervisor <br />Equipment: (1) 140H Cat Motor -Grader, (2) Water trucks, (2) D6 Cat Dozers, (2) 637 Cat Scrapers, (1) Cat Fork- <br />lift, (1) 966 Cat Front end loader. <br />Comanco Lining Activities: 0500-1630 hrs <br />• The Contractor completed installation of the HDPE liner over approved geogrid layer on top deck. The <br />Contractor started installation of the cushion geotextile over the completed HDPE liner on Deck. <br />• The Contractor continued installation of the cushion geotextile on the Cell floor. The Contractor used air <br />blowers over the surface of the HDPE liner prior to the installation of the geotextile to remove accumulated <br />dust and debris. <br />• All geotextile materials installed today was secured with ballast sand bags at the end of the work shift. <br />• Personnel: 13 <br />Equipment: (2) Fork Lifts, (1) equipment trailer, (1) Van, (3) Trucks <br />0 CQA (GLA) Activities: Field Personnel (2) <br />PAGE 1 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.