Laserfiche WebLink
Geo-LoqkASS0CIATES <br />CQA DAILY SUMMARY REPORT <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel performed continuous monitoring and documentation of all construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel monitored installation the HDPE liner at all times insuring that proper procedures were used <br />to prevent damage to the underlying materials. CQA monitored and inspected all HDPE panel repairs for <br />cleanliness, minimum overlap, and the implementation of proper seaming procedures. <br />• CQA personnel monitored the installation of the 12 -oz geotextile at all times ensuring proper seaming <br />methods and handling to prevent damage to the underlying synthetic liner. <br />• CQA personnel performed a final walkthrough inspection with the liner CQC personnel over the HDPE liner <br />surface upon completing cleaning work prior to the geotextile installation on the Cell floor and deck areas. <br />Meetings and Site Discussions: <br />• Met Kevin (Guinn Superintendent) and Jose Hernandez (Comanco Superintendent) in the morning to discuss <br />planned activity for the work shift. Guinn construction will install the perforated 6 -inch HDPE pipe in the <br />south LCRS trench. <br />• Comanco would complete installation of the HDPE on the top deck; will continue cushion geotextile • <br />installation on the Cell floor and start on deck area. <br />Photos: <br />Fig.1 Looking SE on NW floor area in FU 13; cushion geotextile installation. <br />PAGE 2OF3 <br />