My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-LoqkA S S O C I A T E S <br />CQA DAILY SUMMARY REPORT #051 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 051 Report Date: Tuesday July 23, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 63°F Clear PM: 94°F Clear <br />Guinn Construction Activities: <br />• The Contractor installed the leachate tanks in both the south and north sumps today. The Contractor <br />continued placement of the coarse drainage gravel in the east LCRS trench over the perforated HDPE pipe. <br />• The Contractor installed the drain rock unloader at the south end of the Cell in close proximity to the LCRS <br />trench. The Contractor will start placement of the drain gravel on the Cell floor tomorrow 07/24. <br />• • The Contractor excavated liner anchor trench along the east limits of the upper slope section. The Contractor <br />installed the synthetic liner in the anchor trench. The Contractor performed backfill and compaction of the <br />anchor trench. <br />• The Contractor started placement of the granular drainage gravel upon completion of the liner anchor trench <br />backfill along the east end of the upper slope section. The drainage gravel was transferred with a rock truck <br />and spread in a continuous 12 -inch lift with a D6 Cat LGP Dozer equipped with GPS for grade control. <br />Personnel: (1) Superintendent, (1) Grade Checker, (10) Operators, (2) Laborers. <br />Equipment: (1) 140H Cat Motor -Grader, (1) Water truck, (1) Cat Excavator, (1) D6N Cat Dozer, (1) D6R Cat <br />Dozer, (2) 637 Cat Scrapers, (1) Cat Fork-lift, (1) Rock unloader conveyor, (1) 740 Cat Rock Truck. <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of construction activities insuring <br />conformance with the project specifications. <br />• CQA personnel monitored installation of the HDPE leachate tanks insuring that proper procedures were <br />implemented to prevent damage to the underlying synthetic liner. <br />• • CQA personnel monitored the installation of the liner anchor trench along the east end of the upper slope; <br />performed moisture density test on the compacted fill in conformance with the project specifications. <br />PACE 1 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.