Laserfiche WebLink
Geo-LoqkA S S O C I AT E S <br />CQA DAILY SUMMARY REPORT #053 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• Met with Kevin (Guinn Superintendent) in the morning to discuss planned activity for the work shift. The <br />Contractor would continue installation of the drainage gravel layer in the south half of the Cell. The <br />Contractor would start installation of filter geotextile over the drainage rock tomorrow 07/26. CQA requested <br />as -built survey of the completed portion of the drain gravel prior to the installation of the filter geotextile. <br />Site Visitors: <br />• None <br />Photos: <br />Fig.1 Looking south over FU 13 floor area. <br />PAGE 2 OF 2 <br />• <br />• <br />