Laserfiche WebLink
Geo-LoqkASS0CIATES <br />CQA DAILY SUMMARY REPORT #055 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA personnel monitored the installation of the filter geotextile at all times ensuring that proper procedures <br />were used to prevent damage to the completed drainage layer and the underlying synthetic liner. CQA <br />personnel verified minimum panel overlap and seam continuity. <br />• CQA monitored the placement of the OPS layer at all times ensuring that proper lift thickness was <br />maintained and that care was taken to prevent damage to the underlying synthetic and granular drainage <br />layers. <br />Meetings and Site Discussions: <br />• Met with Kevin (Guinn Superintendent) in the morning to discuss planned activity for the work shift. The <br />Contractor would complete installation of the drainage gravel and the filter geotextile layers in the south half <br />of the Cell. The Contractor would continue placement of the OPS layer in the south half of the Cell. <br />Site Visitors: <br />None <br />Photos: <br />Fig.1 Looking west on southeast quarter of FLI-13. <br />a Zi <br />• <br />• <br />