Laserfiche WebLink
Geo -Logic <br />A S S 0 C I A T E S <br />CQA DAILY SUMMARY REPORT # <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />• CQA monitored the placement of the OPS layer at all times ensuring that proper lift thickness was <br />maintained and that care was taken to prevent damage to the underlying synthetic and granular drainage <br />layers. <br />Meetings and Site Discussions: <br />• Met with Kevin (Guinn Superintendent) in the morning to discuss planned activity for the work shift. The <br />Contractor would complete installation of the drainage gravel and the filter geotextile layers in the north <br />quarter of the Cell; would continue OPS layer placement over completed filter fabric. <br />Site Visitors: <br />None <br />Photos: <br />Fig.1 Looking west on north half of Cell floor. <br />PAGE 2 OF 2 <br />0 <br />• <br />