My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo -Logic <br />A S S 0 C I A T E S <br />CQA DAILY SUMMARY REPORT #061 <br />REPUBLIC SERVICES FORWARD LANDFILL, FU -13 <br />Location: Manteca, CA Owner: Republic Services <br />CQA Consultant: Geologic Associates Contractors: Guinn Construction <br />Prepared by: Jose Armenta (GLA) Comanco Environmental Corp. <br />Submitted to: Scott Purdy (GLA) <br />Project #: 2013-AO55 <br />Report No.: 061 Report Date: Monday August 05, 2013 Onsite: 06:00 - 16:30 Hrs <br />Weather: AM: 57°F Clear PM: 89°F Clear <br />Guinn Construction Activities: <br />• The Contractor continued placement of the granular drainage gravel in the upper deck area. The Contractor <br />used a wide track LGP D6R Cat Dozer equipped with GPS to spread the granular drainage gravel in a <br />continuous 12 -inch lift. The Drainage gravel was transferred from the stockpile located NE of the Cell. <br />The Contractor continued placement of the filter fabric over the completed granular drainage layer in the. <br />• The Contractor installed and welded the 8 -oz geotextile panels using the hot-air seaming method using two <br />(2) leister heat guns. The filter geotextile was deployed from east to west with a minimum of 12 -inch seam <br />overlap. <br />• The Contractor continued placement of the 12 -inch operations soil layer over the completed filter fabric layer <br />in the upper deck. The Contractor used a 760 Cat rock truck to transfer the drainage gravel and the soil <br />materials; a D6 Cat dozer equipped with GPS was used to spread the granular and soil materials to the <br />required thickness. <br />Personnel: (4) Operators, (1) Supervisor, (1) Grade checker, (3) Laborers. <br />Equipment: (1) Water truck, (2) 637 Cat Scrapers, (1) D6N Cat Dozer, (1) D6R LGP Cat Dozer, (1) 966 Cat <br />Loader, (1) 14H Cat Motor grader, (1) Cat Fork Lift, (1) Generator, (2) Leister Heat Guns. <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of all construction activities ensuring conformance with the <br />project specifications. <br />• CQA personnel monitored the placement of the drainage gravel material at all times ensuring that proper <br />40 procedures were used to prevent damage to the underlying synthetic liner. <br />►K9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.