My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Losic <br />ASS0CIATES <br />FOWARD LANDFILL, WMU FU -13 <br />Location: <br />Manteca, CA Owner: <br />CQA Consultant: <br />Geo -logic Associates Contractors: <br />Prepared by: <br />Jose Armenta (GLA) <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Weekly Report No.: 001 <br />Contractors Activity <br />Guinn Construction Activities: <br />CQA WEEKLY SUMMARY REPORT #001 <br />Republic Services <br />Guinn Construction <br />Comanco Environmental Corp. <br />Report Period: 05/16-05/19/13 <br />• The Contractor started exposing the synthetic liner tie-in along the North WMU-FU13 limits (WMU-FU08 tie- <br />in) using an excavator and two laborers. <br />• The Contractor completed clearing slope and floor areas; all top soil and non -suitable materials were <br />stockpiled in a designated area and used for daily cover per site operations personnel. <br />• The Contractor started floor subgrade excavation. The Contractor stockpiled the excavated material along <br />• the south limits of WMU-FU13; upon completion of the buttress fill subgrade preparation the Contractor <br />started using the excavated material for buttress fill. <br />The Contractor completed buttress subgrade preparation (moisture conditioning and compaction). <br />• The Contractor performed continuous moisture conditioning and dust control during construction activity this <br />week. <br />Personnel: 8 <br />Equipment: (1) Excavator, (2) Water Trucks, (4) 637 Cat Scrapers, (3) D6 Cat Dozers, (1) Cat Fork Lift, (1) 966 <br />Cat Loader, (1) 160H Cat Motor -Grader. <br />Comanco Lining Activities: <br />None <br />Comanco Personnel: (0) <br />• Equipment: NA <br />PAGE 1 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.