Laserfiche WebLink
Geo -Logic <br />ASSOCIATESV <br />CQA WEEKLY SUMMARY REPORT <br />FOWARD LANDFILL, WMU FU -13 <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed a site walk with the Contractor upon mobilization to the construction site. <br />• CQA personnel performed continuous monitoring of field construction activity. <br />• CQA personnel completed lab and field testing of buttress subgrade preparation along the North Slope toe <br />line. <br />• CQA personnel performed soil sampling of soil material intended for general, buttress, and slope subgrade <br />fill. <br />Weekly Synthetic Liner Quantities: <br />Photo: <br />Fig.1 Looking North on WMU-FU13; floor subgrade excavation, buttress fill, and existing liner tie-in excavation. <br />• <br />PAGE 2 OF 2 <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />sf <br />0 <br />0 <br />0 <br />0 <br />Photo: <br />Fig.1 Looking North on WMU-FU13; floor subgrade excavation, buttress fill, and existing liner tie-in excavation. <br />• <br />PAGE 2 OF 2 <br />