Laserfiche WebLink
Geo-Losic <br />ASSOCIATE <br />CQA WEEKLY SUMMARY REPORT #0 <br />FOWARD LANDFILL, WMU FU -13 <br />• CQA personnel performed lab and field testing of buttress fill. <br />• CQA personnel performed soil sampling of proposed clay soil borrow area located approximately 400 ft east <br />of WMU FU -13. <br />• CQA personnel attended the project weekly progress meeting held on site at 11 am on 05/21/13; refer to <br />the CQA weekly project Progress Meeting No. 1 minutes. <br />• CQA manager contacted the Designer to obtain quantities required for the geogrid material and to clarify <br />the overlap requirements <br />CQA manager contacted Tensar to enquire about a local source of geogrid material. It appears that it would <br />be best to obtain the geogrid directly from Tensar. <br />Weekly Synthetic Liner Quantities: <br />Fig.1 Looking East on WMU FU -13; floor subgrade excavation, buttress fill, and existing liner tie-in excavation. <br />PAGE 2OF2 <br />• <br />• <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />(sf) <br />0 <br />0 <br />0 <br />0 <br />Fig.1 Looking East on WMU FU -13; floor subgrade excavation, buttress fill, and existing liner tie-in excavation. <br />PAGE 2OF2 <br />• <br />• <br />