My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Geo -Logic <br />ASSOCIATE <br />FOWARD LANDFILL, WMU FU -13 <br />Location: <br />Manteca, CA <br />CQA Consultant: <br />Geo -Logic Associates <br />Prepared by: <br />Jose Armenta (GLA) <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Weekly Report No.: 003 <br />Contractor's Activity <br />Guinn Construction Activities: <br />CQA WEEKLY SUMMARY REPORT #003 <br />Owner: Republic Services <br />Contractors: Guinn Construction <br />Comanco Environmental Corp. <br />Report Period: 05/27-06/02/13 <br />The Contractor completed exposing the synthetic liner limits along the west side of WMU-FU13 (WMU FU - <br />10). <br />The Contractor continued WMU FU -13 floor subgrade excavation; the excavated material was used to build <br />buttress against WMU FU -08. <br />• The Contractor performed continuous moisture conditioning and compaction during the buttress fill <br />• placement. <br />The Contractor performed continuous dust mitigation work during construction activities, used two water <br />trucks. <br />Personnel: 11 <br />Equipment: (1) Excavator, (2) Water Trucks, (5) 637 Cat Scrapers, (3) D6 Cat Dozers, (1) Cat Fork Lift, (1) 966 <br />Cat Loader, (1) 140H Cat Motor -Grader. <br />Comanco Lining Activities: <br />None <br />Comanco Personnel: (0) <br />Equipment: NA <br />• CQA (GLA) Activities: Field Personnel (1) <br />PAGE 1 OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.