Laserfiche WebLink
Geo-LoqkASS0CIATES <br />CQA WEEKLY SUMMARY REPORT #006 <br />---- - -- - ------------- ------ - _ --- ----- - ----- ------ -- <br />FOWARD LANDFILL, WMU FU -13 <br />• Equipment: None <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring of field construction activity insuring conformance with the <br />project CQA plan and design drawings. <br />• CQA personnel performed continuous monitoring of the clay soil processing activities in the stockpile area; <br />continuously monitored clay excavation at the borrow site insuring continuity of clay soil material; <br />performed lab soil classification testing of processed clay material. <br />• CQA personnel continued review of MQC certification data submitted by the synthetic liner manufacturers. <br />The MQC data submitted to -date was found to be acceptable and in conformance with the project <br />specifications. <br />• The project weekly progress meeting was held on site on Tuesday June 18th in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weeldy Synthetic Liner Quantities: <br />• <br />Ge rid <br />GCL <br />HDPE <br />Geotextile <br />Drain Rock <br />(sf) <br />(sf) <br />(sf) <br />(sf) <br />(c <br />Photo: <br />PAGE 2 OF 3 <br />• <br />