My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br />• <br />Geo-LoqkASS0CIATES <br />FOWARD LANDFILL, WMU FU -13 <br />Location: <br />Manteca, CA Owner: <br />CQA Consultant: <br />Geo -Logic Associates Contractors: <br />Prepared by: <br />Jose Armenta (GLA) <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Weekly Report No.: 006 <br />Contractor's Activity <br />Guinn Construction Activities: <br />CQA WEEKLY SUMMARY REPORT #006 <br />Republic Services <br />Guinn Construction <br />Comanco Environmental Corp. <br />Report Period: 06/17-06/23/13 <br />The Contractor performed cleaning work along the North tie-in line with laborers using rakes and shovels to <br />remove loose soil adjacent to the synthetic liner. <br />The Contractor completed liner anchor trench excavation at the 68 ft contour line on the west and north <br />slopes; completed the liner termination anchor trench on the east side of the north slope. <br />The Contractor completed removing the existing LCRS sump at the SW corner FU -13. The Contractor built <br />temporary leachate containment with the existing HDPE liner in the LCRS trench beyond the tie-in line in <br />coordination with site management, installed a submergible pump to transfer leachate to a nearby tank. <br />The Contractor completed stockpiling and processing clay material along the south limits of FU -13. The clay <br />material was transferred from a borrow site located approximately 600 ft to the east of the Unit. <br />The Contractor performed work with smooth drum roller on slopes and floor of FU -13. <br />The Contractor started receiving, offloading, and storage of synthetic liner material. The liner material is <br />being stored on the NE side adjacent to FU -13. <br />The Contractor performed continuous dust mitigation work during construction activities, used three water <br />trucks. <br />Personnel: 13 <br />Eguigment: (1) 623 Cat paddle wheel Scrapper, (1) D8 Cat Dozer, (1) Excavator, (3) Water Trucks, (5) 637 Cat <br />Scrapers, (3) D6 Cat Dozers, (1) Cat Fork Lift, (1) 966 Cat Loader, (1) 140H Cat Motor -Grader, (1) Steel drum <br />sheepsfoot compactor, (1) Steel Drum Cat smooth roller, (1) 815 Cat Sheepsfoot Compactor, (1) Tractor w/ <br />disc. <br />Comanco Lining Activities: <br />. . None <br />Personnel: None <br />PACE 1 OF 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.