Laserfiche WebLink
• <br />• <br />• <br />Geo-Logilc <br />ASSOC I A T E S <br />FOWARD LANDFILL, WMU FU -13 <br />Location: <br />Manteca, CA Owner: <br />CQA Consultant: <br />Geo -Logic Associates Contractors: <br />Prepared by: <br />Jose Armenta (GLA) <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />Weekly Report No.: 008 <br />Contractor's Activity <br />Guinn Construction Activities: <br />CQA WEEKLY SUMMARY REPORT #008 <br />Republic Services <br />Guinn Construction <br />Comanco Environmental Corp. <br />Report Period: 07/01-07/07/13 <br />The Contractor performed continuous moisture conditioning of the Cell floor clay liner surface in FU -13. The <br />moisture conditioning of the clay surface was performed throughout the seven (7) days of the week during <br />daylight hours. <br />The Contractor completed clay surface finishing work and as -built survey along the toe of the 2:1 slope in <br />the Cell. <br />The Contractor performed work with the smooth drum roller on slopes and floor of FU -13. <br />The Contractor continued dust control during construction activities. <br />Personnel: 8 <br />Equipment: (1) 623 Cat paddle wheel Scrapper, (1) D8 Cat Dozer, (1) Excavator, (3) Water Trucks, (5) 637 Cat <br />Scrapers, (3) D6 Cat Dozers, (1) Cat Fork Lift, (1) 966 Cat Loader, (1) 140H Cat Motor -Grader, (1) Steel drum <br />sheepsfoot compactor, (1) Steel Drum Cat smooth roller, (1) 815 Cat Sheepsfoot Compactor, (1) Tractor w/ <br />disc. <br />Comanco Lining Activities: <br />• Comanco continued preparing sandbags to ballast the synthetic liner during installation. <br />• Comanco started installation of the synthetic liner from the tie-in line on the west 4:1 side slope to the east <br />on July 2nd <br />Personnel: 12 <br />Equipment: (1) Fork Lift, (1) equipment trailer, (1) Van, (3) Trucks <br />PAGE 1 OF 3 <br />