My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo -Logic <br />ASS0CIATES <br />CQA WEEKLY SUMMARY REPORT <br />FOWARD LANDFILL, WMU FU -13 <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring of field construction activity ensuring conformance with <br />the project CQA plan and design drawings. <br />• CQA personnel performed continuous monitoring of the clay soil surface moisture conditioning and grade <br />finishing work. <br />• CQA performed a final inspection and walkthrough with Comanco and Guinn construction on slope soil <br />surface prior to the installation of the synthetic liner. <br />• CQA personnel performed continuous monitoring and field documentation of synthetic liner installation <br />activities <br />• CQA personnel performed lab testing of LCRS granular materials submitted by Guinn construction. <br />• The project weekly progress meeting was held on site on Tuesday July 2"d in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />r; <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />Drain Rock <br />0 (sf) <br />127,005sf <br />133,287 sf <br />0 (sf) <br />0 c <br />Photo: <br />NkGE2Or3 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.