Laserfiche WebLink
Geo -Logic <br />ASS0CIATES <br />CQA WEEKLY SUMMARY REPORT <br />FOWARD LANDFILL, WMU FU -13 <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring of field construction activity ensuring conformance with <br />the project CQA plan and design drawings. <br />• CQA personnel performed continuous monitoring of the clay soil surface moisture conditioning and grade <br />finishing work. <br />• CQA performed a final inspection and walkthrough with Comanco and Guinn construction on slope soil <br />surface prior to the installation of the synthetic liner. <br />• CQA personnel performed continuous monitoring and field documentation of synthetic liner installation <br />activities <br />• CQA personnel performed lab testing of LCRS granular materials submitted by Guinn construction. <br />• The project weekly progress meeting was held on site on Tuesday July 2"d in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />r; <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />Drain Rock <br />0 (sf) <br />127,005sf <br />133,287 sf <br />0 (sf) <br />0 c <br />Photo: <br />NkGE2Or3 <br />• <br />