My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo-Losic <br />ASSOCIATES <br />FOWARD LANDFILL, WMU FU -13 <br />Location: <br />Manteca, CA Owner: <br />CQA Consultant: <br />Geo -Logic Associates Contractors: <br />Prepared by: <br />Jose Armenta (GLA) <br />Submitted to: <br />Scott Purdy (GLA) <br />Project #: <br />2013-AO55 <br />CQA WEEKLY SUMMARY REPORT #0 <br />Republic Services <br />Guinn Construction <br />Comanco Environmental Corp. <br />Weekly Report No.: 009 Report Period: 07/08-07/14/13 <br />Contractor's Activity <br />Guinn Construction Activities: Personnel: 7 <br />The Contractor performed continuous moisture conditioning of Cell floor Clay liner surface in FU -13. The <br />moisture conditioning of the exposed clay surface was performed throughout daylight hours prior to the <br />installation of the synthetic liner. <br />• The Contractor completed the remainder of the clay surface finishing work and the as -built survey. <br />• The Contractor performed work with the smooth drum roller on floor of FU -13 prior to the installation of the <br />synthetic liner. • <br />The Contractor moisture conditioned and stockpiled clay plug material. <br />The Contractor continued dust control during construction activities. <br />Equipment: (1) 623 Cat paddle wheel Scrapper, (1) D8 Cat Dozer, (1) Excavator, (3) Water Trucks, (5) 637 Cat <br />Scrapers, (3) D6 Cat Dozers, (1) Cat Fork Lift, (1) 966 Cat Loader, (1) 140H Cat Motor -Grader, (1) Steel drum <br />sheepsfoot compactor, (1) Steel Drum Cat smooth roller, (1) 815 Cat Sheepsfoot Compactor, (1) Tractor w/ <br />disc. <br />• Comanco Lining Activities: Personnel: 13 <br />• Comanco continued preparing sandbags to ballast the synthetic liner during installation. <br />• Comanco completed installation of the GCL and single sided HDPE liners on the 4:1 and 2:1 side slopes. <br />• Comanco completed installation of the double sided textured liner on the Cell floor over the clay liner. <br />• Comanco started deployment of the single sided Geocomposite on the 4:1 slope starting from west to east. <br />Eouil2ment: (2) Fork Lifts, (1) equipment trailer, (1) Van, (3) Trucks. 0 <br />PAGE I OF 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.