Laserfiche WebLink
• <br />Geo-LoqkASS0CIATES <br />CQA WEEKLY SUMMARY REPORT #009 <br />FOWARD LANDFILL, WMU FU -13 <br />CQA (GLA) Activities: Field Personnel (2) <br />• CQA personnel performed continuous monitoring and documentation of field construction activities insuring <br />conformance with the project CQA plan and design drawings. <br />• CQA personnel performed continuous monitoring of the clay soil surface moisture conditioning and grade <br />finishing work. <br />• CQA performed final walkthrough inspection with Comanco and Guinn construction of soil surface areas <br />prior to the installation of the synthetic liner. CQA performed final walkthrough inspection with Comanco <br />personnel over each of the completed synthetic liner components. <br />• CQA personnel performed onsite testing of seam destructive samples obtained from HDPE liner production <br />seaming. <br />The project weekly progress meeting was held on site on Wednesday July 10th in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />Geo rid <br />GCL <br />HDPE <br />Geotextile <br />Drain Rock <br />0 (sf) <br />86,030 (sf) <br />268, 895 sf <br />0 (sf) <br />0 c <br />Photo: <br />PAGE 2 OF 2 <br />Fig.1 Looking NW on FU -13, HDPE liner surface. <br />