My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geo -Logic <br />ASSOC IATES�/ <br />CQA WEEKLY SUMMARY REPORT #16 <br />FOWARD LANDFILL, WMU FU -13 <br />Location: Manteca, CA Owner: <br />CQA Consultant: Geo -Logic Associates Contractors: <br />Prepared by: Jose Armenta (GLA) <br />Submitted to: Scott Purdy (GLA) GLA Project #: <br />Weekly Report No.: 012 <br />Contractor's Activity <br />Guinn Construction Activities: Personnel: 9 <br />The Contractor completed LCRS piping installation. <br />Republic Services <br />Guinn Construction <br />Comanco Environmental Corp. <br />2013-AO55 <br />Report Period: 07/29-08/04/13 <br />• The Contractor completed the coarse gravel drain rock over the perforated HDPE pipe. <br />• The Contractor continued installation of the drainage gravel layer in the south half of the Cell floor and on <br />the 4:1 slope. <br />• The Contractor continued installation of the 8 -oz filter fabric over the drain gravel in the north half of the <br />Cell floor and on the 4:1 slope area. • <br />• The Contractor continued placement of the 12 -inch operations soil layer on Cell floor and in the east half of <br />the 4:1 slope. <br />• The Contractor continued dust control during construction activities. <br />Equipment: (1) 623 Cat paddle wheel Scrapper, (1) Excavator, (1) Water Trucks, (2) 637 Cat Scrapers, (1) D6N <br />Cat Dozer, (1) D6R Cat LGP Dozer, (1) Cat Fork Lift, (1) 966 Cat Loader, (1) 140H Cat Motor -Grader, (1) Steel <br />Drum Cat smooth roller. <br />• Comanco Lining Activities: Personnel: 0 <br />• None <br />CQA (GLA) Activities: Field Personnel (1) <br />• CQA personnel performed continuous monitoring and documentation of field construction activities ensuring <br />conformance with the project CQA plan and the design drawings. <br />• CQA personnel monitored the installation of the filter 8 -oz geotextile installation over the drain gravel. <br />• CQA personnel performed lab testing of LCRS drainage gravel materials transferred to the site for FU -13. <br />
The URL can be used to link to this page
Your browser does not support the video tag.