• <br />• <br />Geo -Logic <br />ASSOCIATES <br />CQA WEEKLY SUMMARY REPORT #011 <br />FOWARD LANDFILL, WMU FU -13 <br />• CQA personnel performed continuous monitoring and documentation of field construction activities insuring <br />conformance with the project CQA plan and the design drawings. <br />• CQA personnel monitored the installation of the 12 oz geotextile installation. <br />• CQA performed final inspection and walkthrough on the completed synthetic liner in FU -13 with Comanco. <br />• CQA personnel performed field moisture -density testing during backfill and compaction of liner anchor <br />trench on 4:1 slope. <br />CQA personnel performed lab testing of LCRS drainage gravel materials transferred to the site for FU -13. <br />• CQA personnel performed continuous monitoring during the placement of the drainage gravel, coarse <br />gravel, and operations soil layer. <br />• The project weekly progress meeting was held on site on Tuesday July 23rd in the front entrance facility; <br />refer to the CQA weekly project progress meeting minutes. <br />Weekly Synthetic Liner Quantities: <br />Filter Geotextile <br />Cushion Geotextile <br />Geocom osite <br />Drain Rock <br />109,200 (sf) <br />2,800 (sf) <br />0 (sf) <br />4,760 c <br />Photo: <br />PAGE 2OF2 <br />Fig.1 Looking south at half of FU -13 floor. <br />