My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MEETING NOTES <br />Page 2 <br />May 15, 2013 <br />INTRODUCTION <br />• The parties introduced themselves. Guinn is the earthwork contractor. Comanco is the <br />geosynthetics contractor. GLA is the CQA firm and Lewis Engineering is the design <br />engineer. <br />• GLA's lead CQA inspector will be Jose.Armenta, C.E.T. <br />• Guinn's foreman will be Kevin. <br />• Lochlin will serve as the construction manager for Forward. Erin is the site manager <br />and Ruben is the operations manager. <br />• The geomembrane is proposed to be provided by AGRU, the geotextiles by SKAPS, <br />the GCL by GSE, and the Geogrid by Tensar. <br />* Sangeeta provided a project overview and explained that the cell is a standard Subtitle <br />D cell on the base and has subgrade fill/GCL/HDPE Gemembrane/Geocomposite on <br />the slope. <br />* There is a small area of subgrade fill on the east facing slope that may have a slight cut <br />and insufficient fill thickness. Sangeeta will provide information on the area of concern <br />and a pothole will be dug to verify the soil cover thickness and if the subgrade fill <br />grades need adjustment. <br />* The WMU FU -10 tanks collapsed. The specifications for the tank have been the same <br />since 1995, so the reason for the tank collapse in WNW FU -10 compared with <br />successful installations in prior Wmus is unknown. The tanks have not been ordered <br />yet and Ginter will contact Sangeeta to discuss appropriate tanks before ordering. <br />* The area identified as a "trash hump" during the prebid is actually soil used to <br />construct a prior access ramp and does not contain trash. <br />* Phasing of cell construction was discussed between Comanco and Guinn to minimise <br />the time that the clay liner would be exposed. <br />ADMINISTRATIVE/CONTRACTUAL SUBMITTALS <br />* Lochlin will manage the contract. <br />* Erin will be copied on all emails. <br />. 101 D <br />* Guinn submitted a schedule which has a start date of May 15 and projects substantial <br />completion by mid-August. <br />* Excavation is anticipated to take approximately 15 days. <br />* Clay will be stockpiled as part of excavation work. Clay placement is anticipated to i <br />begin June 13. <br />* Comanco will line the upper 4:1 slope first and then do the 2:1 slope. <br />* Liner installation has bee scheduled for 27 working days. <br />
The URL can be used to link to this page
Your browser does not support the video tag.