My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />6. Review of submittals and RFI s: <br />- Submittal S-01 was provided by Guinn. Additional information is required on the <br />properties of the pipe per the specifications for carbon black percentage and <br />maximum hoop strength.. <br />- Guinn is working on the leachate tank submittal. Various options were discussed <br />at the meeting including using a corrugated HDPE pipe with perforations and <br />HDPE plates welded to the top and bottom. A drawing of this tank configuration <br />was prepared by Real Environmental Products and was presented to Sangeeta for <br />review and consideration. <br />7. Review of CQA activities: <br />- The moisture and density testing of the embankment fill placement is going <br />according to the specifications. <br />- GLA is continuing to conduct soils testing on the fill materials per the specified <br />frequency. <br />- GLA's laboratory completed testing of the clay pothole samples. <br />- GLA received and approved the conformance testing from TRI of the <br />geocomposite drainage material. <br />-sandThe northeast area of the cell floor near the sump consists of very fine-grained <br />is that will notprovide • ••• base forthe clay liner.remove <br />sand and replace with finer -grained material (approximately 300 cy). <br />- Guinn was reminded of the importance of getting water into the clay prior to <br />placement. <br />- The final grading of the buttress fill will be evaluated and tested in preparation of <br />geogrid placement. <br />- Buck will conduct and provide an email of the subgrade as -built survey. <br />- Buck will also be called back by Kevin to verify the clay thickness along the toe <br />of slope where Guinn will place about a 20 -foot width of clay to allow for Comanco <br />to run liner down the slope. <br />8. Health and safety/Environmental issues: <br />- Guinn/GLA/Republic reported no health and safety issues for the week. <br />- Guinn will continue to provide copies of the weekly tailgate safety meetings to <br />the Forward front office who will make copies and email to Lochlin. <br />- Republic provided copies of the previous health and safety meetings to GLA. <br />Copies have been attached to these meeting minutes. <br />- Guinn/Republic reported no dust control issues. <br />! - GLA will continue to provide weekly progress reports and CQA reports to Ross at <br />the RWQCB. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.