Laserfiche WebLink
• <br />PROGRESS MEETING NO. 3 <br />Forward Landfill WMU FU -13 Construction <br />Job No. 2013.A055 <br />Date: 6-11-13 <br />ATTENDEES: <br />Scott Harker * <br />FIRM <br />Comanco <br />PHONENAME <br />775.324.7707 <br />sharker comanco.com <br />Ginter Struzyna* <br />Guinn <br />661.327.4562 <br />struzyna(aD-earthmover. com <br />Jeff Affonso * <br />Guinn <br />661.325.6109 <br />affonsoCa)-earthmover. com <br />Scott Purdy * <br />GLA <br />530.272.2448 <br />spurdyCcD_geo-logic.com <br />Jose Armenta <br />GLA <br />661.444.5663 <br />larmenta(a)-geo-logic.com <br />Kevin Turner <br />Guinn <br />661.496.4707 <br />kturner earthmover.com <br />Ruben Ramirez <br />Forward <br />209.982.4298 <br />rramirez _republicservices.com <br />Erin Fanning <br />Forward <br />209.227.9531 <br />efanning(aD-republicservices.com <br />Lochlin Caffey <br />Republic <br />Services <br />925.890.6504 <br />Icaffey2CaD-republicservices.com <br />Via telephone <br />ACTION ITEMS: <br />Scott Harker will provide a quote to Lochlin for the installation of the <br />geogrid. In addition, he will provide a revised schedule for liner installation <br />based on the revised schedule at Keller Canyon. <br />- Guinn will provide a revised piping submittal (S-01). <br />1. Comments from previous meeting: <br />- The date provided for the floor liner placement start date listed in Item No. 3 was <br />incorrect. It should be July 23rd and not June 23rd. <br />2. Review of work progress since previous meeting: <br />- Guinn completed exposing the tie-in from the previous WMU construction. <br />40 - Guinn completed placing embankment fill to the 68' contour and finished grading <br />from the 68 -foot contour to the tie-in. <br />