My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Review of work progress since previous meeting: 40 <br />- Guinn completed the main slope anchor trench and 2:1 slope anchor trench <br />excavation. <br />- Guinn removed overburden and excavated and processed clay material from the <br />location further to the east. The clay is being placed in a stockpile. Approximately <br />14,240 cy have been moved with an additional 6,900 cy of overburden. <br />3. Projected schedule: <br />- Guinn will continue to haul, moisture condition, and stockpile clay. <br />- Guinn will excavate and remove the existing LCRS sump. Guinn with coordinate <br />with Republic for leachate removal and may pump ahead of the sump and remove <br />leachate from the LCRS pipe. <br />- Guinn is set up to do the off loading of the geosynthetics. <br />- Comanco will place liner starting on July 2"d. Comanco will fill sandbags on July <br />1St and Guinn will have the clay completed at the toe of the slope. <br />- The Geogrid should be arriving this week. <br />- Guinn will revise their construction schedule to show clay being placed in two <br />phases. <br />4. Field observations, problems, conflicts, and changes: <br />- GLA stated that Guinn needs to keep the maximum amount of moisture in the <br />clay in order to obtain the required permeability values. <br />- GLA is currently running the first clay stockpile permeability evaluation test at <br />90% compaction and 3% over optimum moisture. The results will be transmitted as <br />soon as they are available. <br />- Guinn will need to proof roll the subgrade prior to liner placement. <br />5. Issues which impede the construction schedule and corrective measures: <br />- GLA just received samples of the geosynthetic materials and will be running large <br />scale direct shear testing on the specified interfaces. This information is critical for <br />the delivery of materials from the manufacturers. <br />6. Review of submittals and RFI's: <br />- Submittal S -01A was provided by Guinn and was approved by GLA for the HDPE <br />pipe. <br />- Guinn provided the leachate tank submittal, S-02. Various options were discussed <br />at the meeting including using a corrugated HDPE pipe with perforations and <br />HDPE plates welded to the top and bottom. Based on the cost and ability to reuse <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.