Laserfiche WebLink
9. Other items: 0 <br />-- Guinn will be taking July 4th and 5th off for the holiday. Comanco will continue to <br />work during this period. <br />- Ruben with Republic would like a 10% road built into the cell at the end of <br />construction to facilitate waste placement. Guinn will provide an estimate to <br />conduct this work. <br />- The existing tie-in on the southwest corner has geocomposite that has <br />undergone some degradation in the sun. When Comanco comes out to the site, <br />this area will be evaluated to determine if the material needs to be replaced. <br />Forward Landfill WMU FU -13 <br />Progress Meeting Minutes Page 4 <br />