Laserfiche WebLink
Final Construction Quality Assurance Report — WMU FU -13 <br />Forward Landfill <br />7.0 AS -BUILT SURVEYS • <br />Surveys to verify the elevations and grades of the earthworks were conducted by RJA & <br />Associates Surveying, under the direction of Mr. Buck Buxton, a professional land surveyor <br />registered in the State of California. The earthwork components surveyed include the <br />following: <br />• Top of prepared subgrade; <br />• Top of the low permeable clay liner; <br />• LCRS trenches; <br />• Top of operation layer soils; and <br />• Anchor trenches/liner limits. <br />As -built surveys for the prepared subgrade, clay liner, operations layer, and anchor <br />trenches/liner limits are presented in Appendix O. <br />• <br />32 Geo—Logic <br />ASSOCIATES <br />