• 8.0 CONCLUSION <br />• <br />Final Construction Quality Assurance Report —WMU FU -13 <br />Forward Landfill <br />Construction of the WMU FU -13 composite liner system was completed in August of 2013. <br />Based on our observations and testing during the construction of the above referenced system <br />at the Forward Landfill, it is GLA's professional judgment that the construction was completed <br />in general accordance with the project Plans and Specifications, CQA Manual, applicable <br />regulations, and approved design modifications. <br />33 Geo -Logic <br />ASSOCIATES <br />