Laserfiche WebLink
C7 <br />v <br />C <br />2. The supplier has a large enough operation and the necessary experience to <br />supply and support the construction on a timely basis. <br />3. Past experience in the design and construction of at least 10 projects of a similar <br />magnitude of the proposed system can be documented. <br />B. Pre -Construction Conference - Prior to the installation of the geogrid, the <br />GEOSYNTHETICS CONTRACTOR shall arrange a meeting at the site with the <br />geogrid material supplier and, where applicable, the geogrid installer. The OWNER, <br />DESIGN ENGINEER, and QA/QC CONSULTANT shall be notified at least 3 days <br />in advance of the time of the meeting. The representative of the geogrid supplier shall <br />be available on an "as -needed" basis during construction. <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Storage and Protection <br />1. Prevent excessive mud, wet concrete, epoxy, or other deleterious materials from <br />coming in contact with and affixing to the geogrid materials. <br />2. Store at temperatures above -20 degrees F (-29 degrees Q. <br />3. Rolled materials may be laid flat or stood on end. <br />PART PRODUCTS <br />A. Acceptable Suppliers - An approved source is The Tensar Corporation, Morrow, GA <br />or their designated representative. <br />B. Alternate suppliers may be acceptable with written authorization of the DESIGN <br />ENGINEER. <br />2.2 MATERIALS <br />A. Geogrid - The required physical and mechanical properties of geogrid reinforcement <br />shall be as shown on the plans or established in writing by the Engineer. <br />Forward Landfill WMU FU -13 <br />02779 3 <br />[ft 0Zs7R117 <br />