My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C7 <br />v <br />C <br />2. The supplier has a large enough operation and the necessary experience to <br />supply and support the construction on a timely basis. <br />3. Past experience in the design and construction of at least 10 projects of a similar <br />magnitude of the proposed system can be documented. <br />B. Pre -Construction Conference - Prior to the installation of the geogrid, the <br />GEOSYNTHETICS CONTRACTOR shall arrange a meeting at the site with the <br />geogrid material supplier and, where applicable, the geogrid installer. The OWNER, <br />DESIGN ENGINEER, and QA/QC CONSULTANT shall be notified at least 3 days <br />in advance of the time of the meeting. The representative of the geogrid supplier shall <br />be available on an "as -needed" basis during construction. <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Storage and Protection <br />1. Prevent excessive mud, wet concrete, epoxy, or other deleterious materials from <br />coming in contact with and affixing to the geogrid materials. <br />2. Store at temperatures above -20 degrees F (-29 degrees Q. <br />3. Rolled materials may be laid flat or stood on end. <br />PART PRODUCTS <br />A. Acceptable Suppliers - An approved source is The Tensar Corporation, Morrow, GA <br />or their designated representative. <br />B. Alternate suppliers may be acceptable with written authorization of the DESIGN <br />ENGINEER. <br />2.2 MATERIALS <br />A. Geogrid - The required physical and mechanical properties of geogrid reinforcement <br />shall be as shown on the plans or established in writing by the Engineer. <br />Forward Landfill WMU FU -13 <br />02779 3 <br />[ft 0Zs7R117 <br />
The URL can be used to link to this page
Your browser does not support the video tag.