My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.3.4 Processing Daily Reports 0 <br />The QA/QC Inspectors write a daily record of work progress. The daily reports are reviewed by the <br />QA/QC Manager for legibility, clarity, traceability, and completeness. The review must be <br />evidenced by signature. A weekly summary construction report will be prepared by the QA/QC <br />Consultant and submitted to the Construction Manager. <br />2.3.5 Processing Test Reports <br />A test report must be completed by the QA/QC Inspectors whenever testing is performed. The test <br />reports must be reviewed by the QA/QC Manager. The review includes a check for mathematical <br />accuracy, conformance to test requirements, conformance to specifications, and for clarity, legibility, <br />traceability, and completeness. The review must be evidenced by a signature of the reviewer. Test <br />reports (or summaries) from independent testing laboratories will also be transmitted to the QA/QC <br />Manager for review. <br />2.3.6 Processing Project Records <br />Project records are completed as needed. Use of the project records is limited to the scope for which <br />they are intended. The record must be completed by filling in all of the blanks provided on the form, <br />followed by the signature of the individual completing the form. All project records must be <br />maintained at the site. <br />2.4 Documentation and Control of Non -Conformance <br />2.4.1 Observation of Non -Conformance <br />Whenever a non-conformance is discovered or observed in the construction process, product, job <br />related materials, documentation, or elsewhere, the QA/QC Manager and QA/QC Inspectors should <br />first notify the foreman or superintendent supervising the work in question. The QA/QC Manager <br />should then notify the Construction Manager. <br />2.4.2 Determining Extent of Non -Conformance <br />Whenever a non-conformance is discovered or observed in the construction process, product, job- <br />related materials, documentation, or elsewhere, the QA/QC Consultant will determine the extent of <br />the non-conformance. The extent of the deficiency may be determined by additional sampling, <br />testing, observations, review of records, or any other means deemed appropriate. <br />Page 8 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.