® 2.4.3 Documenting Non -Conformance <br />All non-conformance must be documented in writing on the daily records, logs, and elsewhere, as <br />appropriate. The documentation must occur immediately upon determining the extent of the non- <br />conformance. For those non-conformance which are considered serious or complex in nature, or <br />which require an engineering evaluation, a Non-conformance Report will be prepared and issued to <br />the Construction Manager and Contractor. <br />2.4.4 Corrective Measures <br />For a simple or routine non-conformance, corrective measures will be determined by specification <br />direction, or if none exists, the Construction Manager, QA/QC Manager and Contractor will discuss <br />standard construction methods to correct the deficiency. For Non-conformance Reports which <br />require an engineering evaluation, the Design Engineer must determine corrective measures. A copy <br />of the Non-conformance Report, with the Design Engineer's corrective measure determination, will <br />be forwarded to the Construction Manager, QA/QC Manager, and Contractor for implementation of <br />the corrective action. <br />2.4.5 Verification of Corrective Measures <br />Upon notification by the Contractor that a corrective measure is complete, the QA/QC Manager will <br />verify its completion. The verification must be accomplished by observations or retesting and <br />documented photographically. Written documentation of the corrective measures must be made by <br />the QA/QC Manager on daily reports, logs, and forms, and, if applicable, the Non-conformance <br />Report. Verification of corrective measure will be reviewed by the Construction Manager. <br />Corrective action measures that require an engineering evaluation will be reviewed and verified by <br />the Design Engineer. <br />2.5 Construction Monitoring <br />2.5.1 Monitoring Priorities <br />Before commencement of construction, the QA/QC Manager will establish a list of monitoring <br />priorities. The list includes the various construction activities and the monitoring priority of those <br />activities. The monitoring priorities may change during construction, based upon Contractor <br />performance and Owner request. Changes in the monitoring priorities must be approved by the <br />QA/QC Manager. <br />2.5.2 Discrepancies <br />All CQA testing must be conducted in accordance with this CQA Manual. If discrepancies exist <br />between the Specifications and the CQA Manual, the document that requires the most frequent tests <br />or has more stringent test requirements will govern, unless otherwise specified by the Design <br />Engineer. <br />0 Page 9 <br />