My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2013_3
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
Archived Reports
>
ARCHIVED REPORTS_2013_3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2020 3:53:43 PM
Creation date
7/3/2020 10:57:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2013_3
RECORD_ID
PR0440005
PE
4433
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106001-3, 5
CURRENT_STATUS
01
SITE_LOCATION
9999 AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\SW\SW_4433_PR0440005_9999 AUSTIN_2013_3.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
748
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.6 Materials Quality Verification <br />2.6.1 General <br />Material sources will be identified and samples tested to determine if the material meets project <br />specifications for specific work elements. Definitions and requirements of materials are provided in <br />the Specifications. Test samples will be obtained in accordance with applicable ASTM standards. <br />Archive samples and test results of the test samples will be maintained and stored at the project site. <br />The QA/QC Inspectors will establish and maintain a materials quality verification list. The list will <br />include material sources, sample locations, testing requirements, test results, and verification action <br />items. <br />2.6.2 Materials Submittals <br />Material submittals may be used by the QA/QC Consultant to establish the acceptability of materials. <br />When sample submittals are required, they will be made available to the QA/QC Consultant by the <br />Contractor. Acceptance and proper review of submittals are the responsibility of the QA/QC <br />Manager. <br />2.6.3 Certificates of Compliance and Conformance <br />Certificates of compliance and conformance may be used by the QA/QC Manager to establish the <br />acceptability of materials. Those certificates generally state that the material is in compliance or <br />conformance with a particular code, standard, or specification. The certificate may be used for <br />acceptance of a product before or in lieu of testing, if allowed by the Specifications. <br />2.7 Equipment Control <br />2.7.1 Equipment List <br />Before the start of construction, the QA/QC Manager will complete a list of all measuring, sampling, <br />and testing equipment being used at the site. As new equipment becomes available during the course <br />of the project, it must be added to the list. When more than one type of equipment is available, a <br />unique number will be affixed to each piece to maintain identity. The equipment list shall be <br />maintained in the project files and contain the following information: <br />Type of equipment <br />Serial number or identifying number <br />Date item received at site <br />Use of the equipment <br />Date removed from service <br />Page 10 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.