Laserfiche WebLink
SIGNATURE PAGE <br /> Geo-Logic Associates (GLA) provided construction quality assurance services during the <br /> construction of WMU FU-13, at the Forward Landfill. The following final construction <br /> certification report was prepared by GLA and is hereby submitted to the Regional Water Quality <br /> Control Board (RWQCB). <br /> This report was prepared in accordance with generally accepted geotechnical and geosynthetic <br /> engineering practices applicable at the time the report was prepared. GLA makes no other <br /> warranties, either expressed or implied, as to the professional advice provided under the terms <br /> of this agreement, and as described in this report. Our recommendations consist of <br /> professional opinions and conclusions based on our testing and inspection program performed <br /> during construction. <br /> The purpose of this report is to inform the RWQCB that, in our professional opinion, the WMU <br /> FU-13 liner system at the Forward Landfill has been constructed and completed in general <br /> accordance with the project Plans and Specifications. During the installation, GLA conducted <br /> observations and testing to determine that the construction was conducted in general <br /> accordance with the project Plans and Specifications. The conclusions of our observations and <br /> testing, together with a written narrative describing the personnel, scope, methods, procedures <br /> and results of our CQA services, have been included in this certification report. <br /> GEO-LOGIC ASSOCIATES RED <br /> Scott Purdy, PG, CEG CUITIFED <br /> No EG 1532 <br /> CQA Engineering Geolog <br />