Laserfiche WebLink
Final Construction Quality Assurance Report—WMU FU-13 <br /> Forward Landfill <br /> • 1.0 INTRODUCTION <br /> This report summarizes the construction quality assurance (CCIA) observations and activities <br /> performed by Geo-Logic Associates (GLA)for Forward, Inc. (Forward), during the construction <br /> of WMU FU-13 at the Forward Landfill. <br /> CQA activities included monitoring earthworks construction, geosynthetics deployment, and <br /> leachate collection piping and tank installation. This final report contains detailed <br /> documentation that the construction, including CQA activities associated with the WMU FU-13 <br /> composite liner system, was constructed in general accordance with the following documents: <br /> • Title 27 of the California Code of Regulations; <br /> • WMU FU-13 Construction Drawings, Forward Landfill, Lewis Engineering, April 2013, <br /> • Bid Documents, Waste Management Unit FU-13, Forward Landfill, Lewis Engineering, April <br /> 2013, and <br /> • Construction Quality Assurance (CQA) Manual WMU FU-13, Forward Landfill, Lewis <br /> Engineering, April 2013. <br /> • GLA performed work on this project under authorization from Forward's project manager, <br /> Lochlin Caffey. This report was prepared for Forward by CQA Monitor Jose Armenta and Scott <br /> Purdy, PG, CEG, Project Manager and Engineering Geologist of Record. <br /> • <br /> 1 Geo-Logic <br /> ASSOCIATES <br />